Magnetic Field Test Setup

Magnetic Field TEST SETUP From: 61000-4-8 . IEC:1993 +A1:2000

7  Test set-up

The test set-up comprises the following components:

. ground (reference) plane (GRP);

. equipment under test (EUT);

. induction coil;

. test generator.

Precautions shall be taken if the test magnetic field may interfere with the test instrumentation and other sensitive equipment in the vicinity of the test set-up.

Examples of test set-ups are given in the following figures:

Figure 3: Example of test set-up for table-top equipment

Figure 4: Example of test set-up for floor-standing equipment

7.1  Ground (reference) plane

The  ground  plane  (GRP)  shall  be  placed  in  the  laboratory;  the  EUT  and  auxiliary  test equipment shall be placed on it and connected to it.

The  ground  plane  shall  be  a  non-magnetic  metal  sheet  (copper  or  aluminium)  of  0,25  mm thickness;  other  metals  may  be  used  but  in  this  case  they  shall  have  0,65  mm  minimum thickness.

The minimum size of the ground plane is 1 m × 1 m.

The final size depends on the dimensions of the EUT.

The ground plane shall be connected to the safety earth system of the laboratory.

7.2  Equipment under test

The equipment is configured and connected to satisfy its functional requirements.  It shall be placed on the GRP with the interposition of a 0,1 m thickness insulating support (e.g. dry wood).

The  equipment  cabinets  shall  be  connected  to  the  safety  earth  directly  on  the  GRP  via  the earth terminal of the EUT.

The  power  supply,  input  and  output  circuits  shall  be  connected  to  the  sources  of  power supply, control and signal.

The  cables  supplied  or  recommended  by  the  equipment  manufacturer  shall  be  used.  In absence  of any  recommendation,  unshielded  cables  shall  be  adopted,  of  a  type  appropriate for  the  signals  involved.  All  cables  shall  be  exposed  to  the  magnetic  field  for  1 m  of  their length.

The back filters, if any, shall be inserted in the circuits at 1 m cable lengths from the EUT and connected to the ground plane.

The communication lines (data lines) shall be connected to the EUT by the cables given in the technical specification or standard for this application.

7.3  Test generator

The test generator shall be placed at less than 3 m distance from the induction coil.

One terminal of the generator shall be connected to the ground plane as far as used.

7.4  Induction coil

The induction coil, of the type specified in 6.2.1, shall enclose the EUT placed at its centre.

Different  induction  coils  may  be  selected  for  testing  in  the  different  orthogonal  directions, according to the general criteria specified in 6.2.1 a) and b).

Induction coils used in the vertical position (horizontal polarization of the field) can be bonded (at  the  foot  of one  vertical conductor) directly  to  the  ground  plane, which  represents  the  low side of the coil, as a part of it. In this case, 0,1 m minimum distance from EUT to the ground plane is sufficient.

The  induction  coil  shall  be  connected  to  the  test  generator  in  the  same  way  as  for  the calibration procedure specified in 6.2.2.

The induction coil selected for the tests shall be specified in the test plan.